Home      中文 | English

Product Center

Contact Us

Global Sales

 

Isaac Chen(Marketing Manager)

Isaac.chen@ussl.com

Office: (+86) 20 61857538

Cellphone: (+86) 135 0002 4080

Fax: (+86) 20 61096337

Add: No. 138 Gexin Road, Haizhu District, Guangzhou, China 510250

 

Lindy Yan(Deputy Marketing Manager)

lindy.yan@ussl.com

yanyuan@chinagsi.com

Office: (+86) 20 61857538

Cellphone: (+86) 134 3039 3381

Fax: (+86) 20 61096337

Add: No. 138 Gexin Road, Haizhu District, Guangzhou, China 510250

Organic Growth Project 1 Project

Customer: Bechtel Chile Ltda.

Owner: BHP Billiton,Rio Tinto,JECO Corp.,JECO 2 Ltd.

Location:  Antofagasta, Chile

Material Standard: ASTM

Fabrication Code: AISC, NCH 2369, AWS D1.1 & 1.8

Tonnage:  6,577MT

Duration:  Apr.2013 ~ Nov.2013

USSL Project No.: 8986

Project Description:

The Escondida copper-gold-silver mine is located in the arid, northern Atacama Desert of Chile about 160km southeast the port of Antofagasta, at an elevation of 3,050m above sea level.

Operator and majority owner BHP Billiton want to replace the Los Colorados concentrator at the Escondida mine with a new concentrator at Laguna Seca to produce copper as well as quantities of gold and silver. The project expects to cost US$3.8 billion. 

With a capacity of 152,000 metric tons per day, the new concentrator at Escondida will be the world's highest-capacity, single-line copper concentrator at the largest copper mine on Earth.

 

2014.jpg 

 

 

 

Guangzhou Sales Office:5th Floor, No.138 Gexin Road, Haizhu District, Guangzhou, China

Tel:(+86) 20 61857538

Zhongshan Shop Address: No. 50 Donghui, Tsuihang New District, Zhongshan City, China, 528400

Tel:(+86) 760 87891712

粤ICP备202207137       gzxundu

 

Top