Global Sales
Isaac Chen(Marketing Manager)
Isaac.chen@ussl.com
Office: (+86) 20 61857538
Cellphone: (+86) 135 0002 4080
Fax: (+86) 20 61096337
Add: No. 138 Gexin Road, Haizhu District, Guangzhou, China 510250
Lindy Yan(Deputy Marketing Manager)
lindy.yan@ussl.com
yanyuan@chinagsi.com
Office: (+86) 20 61857538
Cellphone: (+86) 134 3039 3381
Fax: (+86) 20 61096337
Add: No. 138 Gexin Road, Haizhu District, Guangzhou, China 510250
Customer: Bechtel Chile Ltda.
Owner: BHP Billiton,Rio Tinto,JECO Corp.,JECO 2 Ltd.
Location: Antofagasta, Chile
Material Standard: ASTM
Fabrication Code: AISC, NCH 2369, AWS D1.1 & 1.8
Tonnage: 6,577MT
Duration: Apr.2013 ~ Nov.2013
USSL Project No.: 8986
Project Description:
The Escondida copper-gold-silver mine is located in the arid, northern Atacama Desert of Chile about 160km southeast the port of Antofagasta, at an elevation of 3,050m above sea level.
Operator and majority owner BHP Billiton want to replace the Los Colorados concentrator at the Escondida mine with a new concentrator at Laguna Seca to produce copper as well as quantities of gold and silver. The project expects to cost US$3.8 billion.
With a capacity of 152,000 metric tons per day, the new concentrator at Escondida will be the world's highest-capacity, single-line copper concentrator at the largest copper mine on Earth.
Guangzhou Sales Office:5th Floor, No.138 Gexin Road, Haizhu District, Guangzhou, China Tel:(+86) 20 61857538 Zhongshan Shop Address: No. 50 Donghui, Tsuihang New District, Zhongshan City, China, 528400 Tel:(+86) 760 87891712 |